Tag: Commercial
-

ISS managers adjust flight manifest following Progress launch failure
International Space Station (ISS) Program managers are working to re-align resupply and crew rotation manifests following last week’s launch failure of the Progress M-12M/44P spacecraft. The failure of the Soyuz-U booster’s third stage grounded both the Soyuz-U rockets used to launch cargo, and the Soyuz-FG rockets used to launch crews, since both rockets share very…
-

Atlas V wins again – Boeing selects launcher for their CST-100 capsule
The United Launch Alliance (ULA) Atlas V has once again found itself a new passenger, this time via the selection by Boeing to launch its CST-100 capsule as part of their Commercial Crew Development (CCDev-2) proposal. Providing NASA downselects Boeing’s vehicle for commercial missions to the ISS, CST-100 will debut in 2015, following two test…
-

NASA and ULA agree SAA to complete the human rating of Atlas V
NASA and United Launch Alliance (ULA) have announced an agreement for technical support via NASA’s Commercial Crew Program focusing on the human rating of the Atlas V launch vehicle. The unfunded act is expected to result in certifying Atlas V to launch NASA astronauts riding in vehicles such as the Dream Chaser, Boeing CST-100 and…
-

Discovery’s VAB stay part of a commercial transition for the OPFs
With Discovery now enjoying a month-long vacation inside the Vehicle Assembly Building (VAB), following her rollover on Wednesday, the long-term future for the Orbiter Processing Facilities (OPFs) will be heavily focused on attracting the new fleet of commercial vehicles, as the Kennedy Space Center (KSC) transitions into a multi-purpose spaceport. Discovery in the VAB: Following…
-

Discovery’s VAB stay part of a commercial transition for the OPFs
With Discovery now enjoying a month-long vacation inside the Vehicle Assembly Building (VAB), following her rollover on Wednesday, the long-term future for the Orbiter Processing Facilities (OPFs) will be heavily focused on attracting the new fleet of commercial vehicles, as the Kennedy Space Center (KSC) transitions into a multi-purpose spaceport. Discovery in the VAB: Following…
-

Director Paul Hill speaks of the valuable future role to be played by MOD
In an interview with NASASpaceflight.com, Mission Operations Directorate (MOD) Director Paul Hill spoke of his pride for the MOD community, whilst outlining his vision for the future as NASA prepares to transition into a new post-Shuttle era of Commercial opportunities and a return to manned exploration outside of Low Earth Orbit (LEO). MOD Director Paul…
-

NASA and Commercial industry combine to outline FTD Propellant Depot plan
A collaboration between experts at numerous NASA centers and commercial companies have created a plan for an “in-space LO2/LH2 PTSD (Propellant Transfer and Storage Demonstration) mission, to affordably support a 2015 demonstration and follow-on missions”, highlighting an exploration architecture built around existing vehicles and Propellant Depots. PTSD Flagship Technology Demonstration: Answering a Request For Information…
-

CxP PDR successful, with exclusions – Strict Commercial requirements
As the Constellation Program (CxP) splutters along, ahead of its “proposed” cancellation, managers have successfully concluded its Preliminary Design Review (PDR), although several major elements – such as cost and schedule – were omitted from the review due to the “new direction”. Meanwhile, NASA managers preparing a draft document to prospective commercial crew providers, listing…
-

Rocketplane Kistler press on despite COTS notice
Rocketplane Kistler (RpK) was officially notified by NASA on Friday that they had failed to complete two COTS milestones. Sources from both NASA and RpK have confirmed that the letter does NOT represent a final decision by NASA to terminate the company’s COTS contract. Meanwhile, RpK are pressing on with the a new configuration of…