Tag: EM-2
-

NASA, Lockheed Martin working to resolve Artemis II Orion issues, deliver spacecraft around summer’s end
NASA is working with Orion spacecraft prime contractor Lockheed Martin to resolve a handful of issues that came up late last year during ground testing, forcing the space agency to delay the launch readiness target date for its Artemis II circumlunar mission to September 2025. The Lockheed Martin assembly, test, and launch operations (ATLO) team…
-

While Artemis II schedule remains uncertain, NASA EGS preparing to be ready and waiting for stacking
At the Kennedy Space Center (KSC), NASA’s Exploration Ground Systems (EGS) program continues to prepare for the Artemis II circumlunar mission that was recently delayed to September 2025. EGS is finishing certification of new ground systems to support crewed launches of the agency’s Orion spacecraft with its Space Launch System (SLS) rocket beginning with Artemis…
-

Boeing ramps up final assembly to complete Artemis II SLS Core Stage by year end
Following a cost-saving summer slowdown, NASA Space Launch System (SLS) Core Stage prime contractor Boeing is again working two shifts a day at the Michoud Assembly Facility (MAF) in New Orleans to complete final testing and checkout of the unit that will help send NASA astronauts back to the Moon on the Artemis II mission.…
-

SLS working to overcome supply chain, weld issues to complete Artemis II Core Stage this year
NASA is now planning for the Space Launch System (SLS) core stage assigned to the Artemis II lunar flyby mission to be completed in mid-December for subsequent delivery to its Kennedy Space Center (KSC) launch site. The four RS-25 core stage engines were installed in the stage in September at the Michoud Assembly Facility (MAF)…
-

Artemis II crew visits Bremen, as Germany signs the Artemis Accords
ESA and Airbus, in coordination with NASA, hosted an Artemis II media event at the Airbus facility in Bremen, Germany, on Friday, Sept. 15. In this event, the whole crew of Artemis II was present at the facility where Airbus assembles the Orion European Service Module (ESM). The ESM will provide life support and propulsion…
-

RS-25 engine installation into the Artemis II SLS Core Stage begins
Aerojet Rocketdyne, an L3Harris Technologies Company, is helping install four of its RS-25 liquid-propellant rocket engines in NASA’s second Space Launch System (SLS) core stage at the agency’s Michoud Assembly Facility (MAF) in New Orleans. The beginning of installation of the upgraded former Space Shuttle Main Engines (SSME) in Core Stage-2 at MAF on Sept.…
-

NASA modifies ML-1 for Artemis II, ML-2 under construction for SLS Block IB
As construction begins to assemble the Mobile Launcher-2 (ML-2) for Artemis IV, Mobile Launcher-1 (ML-1) secured its position once again back on top of Launch Complex 39B for pad validation and testing. This comes after ML-1 spent the better part of this year undergoing repairs and upgrades outside of the VAB at the West Park…
-

Final ICPS arrives in Florida for Artemis III SLS launch
United Launch Alliance (ULA) delivered the last-ever Space Launch System (SLS) Interim Cryogenic Propulsion Stage (ICPS) from its Decatur, Alabama, factory to Cape Canaveral Space Force Station (CCSFS) in early August for eventual use on the Artemis III lunar landing mission. ICPS-3 was also the last Delta hardware to depart Decatur and will support NASA’s…
-

Lockheed Martin, NASA working around the clock to finish Artemis II Orion assembly and hold 2024 launch date
The Orion spacecraft for the Artemis II mission is nearing final assembly and testing at prime contractor Lockheed Martin’s Kennedy Space Center (KSC) production facility. After a final standalone test on the Orion crew module (CM), it is expected to be mated to the service module (SM) in mid-September. If there are no problems in…
-

Artemis II Moon mission transitioning from planning to preparation
The first crewed Artemis mission is now the focus of NASA’s beyond-Earth orbit human spaceflight programs. Mission training for the recently-named crew for the Artemis II test flight is expected to begin in June, at just about the time that the mission integration review will be conducted. The space agency has been planning for the…