Tag: ET
-

Downstream processing and planning – preparing the fleet through to STS-135
Even though shuttle managers are preparing for two missions in the space of a month, efforts on the downstream flights are at various stages of processing and planning, all the way through to STS-135 – which is currently the LON (Launch On Need) placeholder for what is currently the last shuttle mission – STS-134 –…
-

Managers considering May 11 for STS-125 – ET camera/flash troubleshooting
The dual processing flows for Atlantis and Endeavour are proceeding to plan, with the main engineering focus on the ET camera flash system, which is undergoing troubleshooting on Atlantis. Managers have also completed the review of the SSP (Space Shuttle Program) Flight Readiness Review (FRR), with evaluations taking place on advancing the launch date by…
-

Endeavour rolls out for STS-400 role at Pad 39B – GUCP anomaly status
Shuttle Endeavour has completed her rollout to 39B, where she will be put through a part flow as the STS-400 LON (Launch On Need) support for Atlantis’ STS-125 mission. During this flow, engineers will test the alignment procedures with the Ground Umbilical Carrier Plate (GUCP) – following the leak during STS-119’s opening launch attempt. STS-400/127…
-

Ares/Orion slipping up to 18 months – Shuttle extension gains upper hand
NASA’s Constellation Program (CxP) will conduct a “Content and Schedule” summit meeting in the next few months, after it was evaluated their current schedules are “broken”. The meeting will aim to protect against a slip that is estimated to be as serious as 18 months, or outright cancellation for Ares I. Meanwhile, the push for…
-

STS-119 LIVE: Discovery launches – perfect count and ride to orbit
STS-119 has launched after an issue-free tanking and countdown, following engineering work to troubleshoot a LH2 (GH2) leak from the Ground Umbilical Carrier Plate (GUCP) attached to the External Tank. Discovery launched at 19:43pm local time launch, with added focus on the T-0 umbilicals on the TSM (Tail Service Masts) – following an incident on STS-126.…
-

STS-119: NASA Managers press ahead with Sunday launch attempt
The second launch attempt for STS-119 will take place on Sunday at 19:43pm local time, pending the expected resolution of the leak related to the Ground Umbilical Carrier Plate (GUCP) – which caused the scrub of Wednesday’s attempt. Engineers are currently in S007.300 scrub turnaround procedures, but are eight hours down on the timeline –…
-

STS-119: LH2 leak during tanking postpones launch to March 15
STS-119’s opening launch attempt has been scrubbed until Sunday, March 15,, following a LH2 leak during tanking. The leak related to a carrier plate that is attached to the intertank area of the ET, with attempts to cycle the associated valve to reduce the leak to acceptable proving to be unsuccessful. Scrub info: Work at the…
-

Atlantis and Endeavour deep in processing for their May get-together
While the majority of engineering concentration on the Flow Control Valve (FCV) flight rationale for Discovery and her STS-119 flight, Atlantis – and Endeavour as her rescue support – currently remain on track for their May date surrounding STS-125. Atlantis STS-125 Latest: With STS-119’s NET (No Earlier Than) only slipping my a matter of a…
-

Extra NASA funds: An initial step towards gap reduction options/extension
US lawmakers have agreed on a stimulus package that includes just over $1 billion in additional funds for NASA, to be utilized during 2009 and 2010. While the $400m allocated towards “Exploration” is not specifically earmarked for extension of the shuttle program, it could allow NASA to take the first steps in reducing “The Gap”…
-

Downstream shuttle planning: CLFs, AMS noted, MAF working on extra ETs
Shuttle managers have made extensive changes to their 2010 launch schedule ambitions, with the “inclusion” of STS-134 as an additional flight. Meanwhile, three additional External Tanks being worked on at the Michoud Assembly Facility (MAF) in pre-emption of a shuttle extension. STS-133 and STS-134: According to planning documents on L2, STS-133 will now carry a…