Tag: HLV
-

Acronyms to Ascent – SLS managers create development milestone roadmap
This year will mark several major milestones for the development of the Space Launch System (SLS), with teams already pushing through a systems review process. The roadmap – which may include a “battleship” pathfinder core test at the Kennedy Space Center (KSC) in 2015 – runs through the opening mission in 2017, which has been named as Exploration Mission…
-

Space Launch System: How to launch NASA’s new monster rocket
With the Kennedy Space Center (KSC) falling silent after the retirement of the Space Shuttle, it’ll be at least five years before the public will see the iconic sight of NASA’s follow-on vehicle rising off the launch pad. Interestingly, the Space Launch System (SLS) will follow some of the Shuttle’s heritage of “Flight Operations” –…
-

NASA outline FY13 Budget Proposal amid warnings of political battles to come
The US space agency announced a reduced FY13 budget proposal on Monday, with planetary science becoming this year’s major casualty. The Space Launch System (SLS) and Orion – as exploration – also received cuts, leading to Senator Kay Bailey Hutchison issuing a warning that NASA should not cut any money from the Agency’s exploration vehicles.…
-

SLS interest in DoD launch market and Secondary Payloads potential
The Space Launch System (SLS) teams are looking into the potential of finding extra roles for the vehicle, in addition to – or in tandem with – the flagship exploration missions, noting its availabity for Department of Defense (DoD) payloads and even what is known as “Secondary Payloads” – allowing satellites to hitch a ride…
-

Aerojet cite Solar Electric Propulsion as an enabler for an Exploration Gateway
Aerojet – famous for being a key element of numerous launch vehicle and satellite propulsion systems – believe their Solar Electric Propulsion (SEP) technology can be positively applied to an Exploration Gateway Platform – which has been touted as a potential – and often favored – approach in NASA’s ongoing studies into a long-term exploration…
-

SLS Exploration Roadmap evaluations provide clues for human Mars missions
As NASA managers continue to work through the evaluations into an exploration roadmap for the agency, the end goal of sending humans to Mars is starting to show a level of consistency. Per documentation, the key Design Reference Mission (DRM) evaluations are pointing to the “Flexible Path” approach of visiting a Martian moon, prior to…
-

Engineers begin removing orbiter MPS components for donation to SLS
Kennedy Space Center engineers have begun removing Main Propulsion System (MPS) hardware from the aft of the retired orbiters. The flight-flown hardware – a natural match to the RS-25Ds the SLS will initially fly with – will live on with the monster rocket, as much as some of the orbiter hardware will be focused on…
-

SSME family prepare for SLS core stage role following Shuttle success
NASA’s 15 Space Shuttle Main Engines (SSMEs) are being transported to the Stennis Space Center (SSC), as they transition towards their future role with the Space Launch System (SLS). The highly reliable RS-25Ds – nine of which flew with the last three Space Shuttle missions – will eventually be succeeded by the expendable RS-25E, early…
-

SLS capability touted for Europa Lander capability, Enceladus sample return
As the Space Launch System (SLS) teams head into their first full year since the vehicle was finally announced, fascinating – albeit well into the future – Exploration Systems Development (ESD) Design Reference Mission (DRM) options for deep space have been outlined in the SLS Concept Of Operations (Con Ops), options which include ambitious missions…
-

KSC renovation work continuing ahead of future 21st Century spaceport role
The Kennedy Space Center is undergoing improvements to its buildings and infrastructure, work which will continue at the spaceport through to 2013. Most of the work is taking place on the 50 year old waterway, which links the Turn Basin to the crawlerway through to both Pad 39A and 39B – the latter of which…